Thorpe Reservoir - February 17, 2023 at 2:41 p.m. - Construct 5 MG ground level steel water reservoir.
2022 Street Maintenance Curb Ramps - February 17, 2023 at 2:28 p.m. - Installation of ADA ramps on streets which will receive a grind and overlay by the street department.
Haven Grind & Overlay - February 17, 2023 at 1:57 p.m. - Grind & overlay of Haven St. from Market (near Rockwell) to Market (near Columbia) including pavement repair and ADA ramp replacement.
Washington-Stevens Bridge Deck and Joint Repair - February 9, 2023 at 1:39 p.m. - Bridge deck restoration for three bridges: Washington St. South Channel, Washington St. North Channel, and the Stevens St. Bridge.
Division Street Pedestrian Hybrid Beacons - February 9, 2023 at 1:28 p.m. - Install pedestrian hybrid beacons (crossing signals) at three uncontrolled crosswalks on Division.
Haven Sidewalk - February 3, 2023 at 2:26 p.m. - Sidewalk west side of Haven St.
Cochran Siphon Connections - February 3, 2023 at 2:22 p.m. - Connects the 60" siphon to be installed with TJ Meenach Street and Stormwater Improvements to the existing 60" siphon pipe.
Business Area Grind and Overlay - February 3, 2023 at 2 p.m. - Grind and overlay on various non-arterials in business areas.
Thor-Freya 2nd/3rd Intersections - February 3, 2023 at 1:54 p.m. - Full roadway reconstruction with concrete, curb and stormwater facilities replacement, ADA ramp upgrades, and water/sewer replacements.
Maple Ash Chipseal - February 3, 2023 at 1:48 p.m. - Street maintenance project to apply a layer of oil and rock to the surface of the street to extend pavement life.
Northeast Force Main - February 3, 2023 at 1:41 p.m. - Construct an additional force main (8-inch) between the Northeast Lift Station and the existing stub at Rowan and Myrtle.
Businesses Are Open! - September 16, 2022 at 3:42 p.m. - Businesses are open during Monroe Street construction.
Cochran Basin Treatment Facilities - September 7, 2022 at 10:38 a.m. - Construction of treatment and infiltration ponds at the Downriver Disc Golf Course to treat stormwater generated in the Cochran Basin.
Nevada/Joseph Ped Hybrid Beacon - April 28, 2022 at 11:30 a.m. - Installation of marked crosswalk and pedestrian crossing safety devices, including stop bars, illumination, and audible signals.
Garland Pathway (Cook to Market) - April 28, 2022 at 11:26 a.m. - Installation of shared-use pathway on north side of Garland Avenue from Cook to Market.
2022 Residential Grind and Overlay - April 28, 2022 at 11:22 a.m. - Grind and overlay pavement on Illinois Avenue, from Perry to Market.
Assessing Streets Goes Hi-Tech - April 18, 2022 at 4:24 p.m. - City utilizes technology to gather data for street pavement maintenance.
TJ Meenach Street, Siphon, and Stormwater Improvements - March 29, 2022 at 5:21 p.m. - This project will design & construct stormwater & sanitary sewer improvements in coordination with the TJ Meenach Drive street reconstruction project
Greene/Carlisle Ped Hybrid Beacon and Carlisle Sidewalk - March 1, 2022 at 3:55 p.m. - Project includes pedestrian lighting at crossings, a marked crosswalk, a median refuge island, a pedestrian crossing advance stop bars.
2019 (Cycle 9) School Safety - January 28, 2022 at 2:45 p.m. - Sidewalk and crosswalk improvements. This project is funded with local funds.
Holland Avenue Sewer (Normandie to Colton) - January 25, 2022 at 4:25 p.m. - This project will construct a gravity sewer pipe from North Pointe Lift Station (Colton and Holland) to the intersection of Holland and Normandie.
Thor-Freya Reconstruction (Hartson to Sprague) - January 25, 2022 at 3:53 p.m. - Full roadway reconstruction, curb and stormwater facilities replacement, ADA ramp upgrades, and water/sewer replacements.
Wellesley-Market Intersection Revisions (NSC) - January 19, 2022 at 3:10 p.m. - Improve roadway and intersection capacity in anticipation of future traffic conditions. Upgrade existing utilities.
Riverside Grind and Overlay (Division to Wall) - November 29, 2021 at 3:58 p.m. - Pavement grind and overlay and reconfiguration of traffic lanes on Riverside from Division to Wall to accommodate new bicycle lanes.
CSO 41 Outfall Pipe Replacement - July 19, 2021 at 3:01 p.m. - Replacement of outfall pipe. This project is funded with local funds.
2021 Residential Grind and Overlay – North - June 30, 2021 at 2:47 p.m. - Residential street repaving. Minor storm sewer system repairs and upgrades may also be completed as part of the paving project.
High System Water Tank - June 18, 2021 at 1:59 p.m. - The City is evaluating tank location alternatives for the high system pressure zone.
2021 Residential Grind & Overlay - South - April 23, 2021 at 4:01 p.m. - Repave residential streets. Minor storm sewer system repairs and upgrades may also be completed as part of the paving project.
Spotted Road Booster Station - March 18, 2021 at 2:32 p.m. - Construction of a new water booster station for the Plains Pressure Zone. This project is funded with local funds.
Washington Basin Stormwater Project - December 8, 2020 at 2:53 p.m. - The project includes replacing the water & sewer lines and installing 3 large stormwater treatment vaults & drywells to infiltrate the treated water.
Greene Street and Ermina Avenue Signal Changes - December 8, 2020 at 2:44 p.m. - Signal relocation as required for construction of the North/South Corridor.This project is funded entirely by the WSDOT.
Well Electric Pump #4 Replacement - December 1, 2020 at 5:01 p.m. - Replacement of well pump and motor located at the Upriver Hydroelectric and Waterworks Facility.
CSO 38 Outfall Pipe Replacement - November 17, 2020 at 3:25 p.m. - Replacement of outfall pipe. This project is funded with local funds.
SIA Transmission Line Crossing Under I-90 - November 17, 2020 at 3:04 p.m. - Connect water pipeline from new Plains Booster Station to SIA Reservoir. This project is funded with local funds.
Hatch Road Bridge Deck Replacement - November 17, 2020 at 2:52 p.m. - Replace the existing bridge deck. This project is funded with federal funds.
Rehabilitation of CSO Facilities - November 17, 2020 at 2:43 p.m. - This project includes the rehabilitation in various forms of the three CSO tanks: CSO 34-2, CSO 34-3 and CSO 10.
Sundance III Force Main Replacement - November 17, 2020 at 2:36 p.m. - This project will upgrade an existing PVC sewer force main to ductile iron pipe on Comanche Dr. from Ridge Crest Drive to Shawnee Avenue.
North River Drive Sidewalk - November 17, 2020 at 12:50 p.m. - Grind and overlay, sidewalk installation (on the south side), and stormwater improvements.
CSO 6 Outfall Pipe Replacement - November 17, 2020 at 12:39 p.m. - Replacement of outfall pipe. This project is funded with local funds.
Wellesley/Maple Intersection - November 17, 2020 at 12:34 p.m. - To improve traffic flow, the westbound left turn lane will be lengthened by approximately one block via island modifications.
2021 Street Maintenance Curb Ramps - November 13, 2020 at 5:17 p.m. - Curb ramp installation associated with grind and overlay work to be performed by the Street Department.
Visit Businesses on West Main! - September 29, 2020 at 4:35 p.m. - Businesses are open as Spokane Transit Authority proceeds with construction of stops for new Central City Line
Arterial Curb Ramp Projects - North - May 7, 2020 at 4:52 p.m. - Update curb ramps for ADA compliance on streets where the street department has done grind and overlay projects.
Arterial Curb Ramp Projects - South - May 7, 2020 at 4:47 p.m. - Update curb ramps for ADA compliance on streets where the street department has done grind and overlay projects.
Water Conservation at Manito Park - March 3, 2020 at 4:49 p.m. - Irrigation improvements and addition of SpokaneScape to conserve water in Manito Park
Sprague Avenue Rebuild Phase 2B - February 27, 2020 at 4:51 p.m. - Sprague Ave from Division to Grant. Reconstruct the roadway while enhancing pedestrian and cyclist safety and provide utility replacements/upgrades.
Red Bank Park River Access - February 13, 2020 at 4:50 p.m. - Install boat ramp to Spokane River and parking lot improvements. This project is funded with local and state funds.
2018 (Cycle 8) School Safety Projects - December 4, 2019 at 3:10 p.m. - Sidewalk and crosswalk improvements. This project is funded with local funds.
Spokane Street Preservation North Phase 2 - December 4, 2019 at 2:51 p.m. - Grind and overlay of various streets, update curb ramps for ADA compliance. This project is funded with local and federal funds.
2018 (Cycle 8) Traffic Calming - December 4, 2019 at 2:38 p.m. - Miscellaneous street and sidewalk improvements focused on pedestrians and traffic calming. This project is funded with local funds.
South Gorge Trail Phase 2 - December 4, 2019 at 1:54 p.m. - Construct a 10-foot wide pedestrian & bike trail, water main & pavement reconstruction of Clarke Ave, and stormwater mitigation at various locations.
Ben Burr Crossings at 2nd-Perry and 3rd-Perry - December 4, 2019 at 1:18 p.m. - Crosswalk safety enhancements at Perry-2nd and Perry-3rd Avenues. This project is funded by local, state, and federal funds.
Havana Well Pump Station - December 3, 2019 at 5:04 p.m. - Construct two building well pump station for six new wells (already drilled) including pumps, motors, controls, and yard piping.
Hoffman Well Station Rehabilitation - December 3, 2019 at 3:40 p.m. - Lining of Well No. 2. Pump Replacement of Well No. 2. Electrical replacement at Wells No. 1 and 2.
NSC - Cleveland, Greene, Grace, Jackson, Ralph - December 3, 2019 at 3:04 p.m. - Relocation of city utilities associated with construction of the North Spokane Corridor. This project is funded with local funds.
Hamilton Street Corridor Safety Improvement Project - December 3, 2019 at 2:35 p.m. - Upgrade traffic signals and install left turn lanes to reduce back-ups. Hamilton Street from Desmet Ave to North Foothills Drive.
Creating a Sustainable Construction Workforce - August 14, 2019 at 3:14 p.m. - New grant program available for programs that help women, minorities and veterans get training in the construction trades
2019 Residential Grind & Overlay - August 5, 2019 at 1:27 p.m. - Grind and overlay and ADA ramp reconstruction where necessary. Project funded with local funds.
J-Turn Coming to US 195 - May 8, 2019 at 4:33 p.m. - Washington State Department of Transportation to add a J-turn on US 195 near Thorpe Road.
Geiger Boulevard Utility Improvements - Phase I - February 7, 2019 at 4:03 p.m. - Water and sewer installation within Geiger Boulevard to serve adjacent properties. Project funded with federal and local funds.
2019 Street Maintenance Grind and Overlay - January 9, 2019 at 11:26 a.m. - Street Maintenance Crews will grind the roadway and overlay it to provide a new pavement surface.
CSO Outfall Repairs - December 27, 2018 at 3:33 p.m. - Repairs and upgrades to multiple CSO outfall pipes. Project is funded with local funds.
2019 Residential Chip Seal Projects - December 27, 2018 at 3:24 p.m. - Chip sealing in three residential locations: Stonewall/Dakota, Joseph/Elm, and Fiske.
33rd Avenue from Bernard Street to Division Street - December 27, 2018 at 1:30 p.m. - Pavement reconstruction and grind and overlay. Replace sewer main and 6" water distribution main and 24" water transmission main.
North Spokane Corridor (NSC) – WSDOT - December 20, 2018 at 11:42 a.m. - The North Spokane Corridor (NSC) is a 10.5 mile limited access corridor, linking I-90 on the south, to existing US 2 and US 395 on the north.
Construction Season Comes To an End - December 14, 2018 at 4:16 p.m. - MLK Way and the University District Gateway Bridge open in time for winter!
2018 Street Maintenance Grind and Overlay - September 28, 2018 at 2:37 p.m. - Street Maintenance Crews will grind the roadway and overlay it to provide a new pavement surface.
Post Street Bridge Replacement - August 23, 2018 at 9:09 a.m. - Post Street Pedestrian and Utility Bridge Replacement. Project funded with federal funds.
CSO Basin 25 Improvements, Phase 1 and 2 - May 8, 2018 at 4:24 p.m. - Water, sanitary and storm sewer installation/replacement and creation of stormwater swales on Main Ave, Water Ave, and Cedar St.
Orange cones are coming! - March 26, 2018 at 4:51 p.m. - Mayor Condon launches 2018 construction season, featuring $67 million in new work.
North Monroe Corridor - March 23, 2018 at 10:07 a.m. - The City will rebuild North Monroe Street from Indiana Avenue to Kiernan Avenue, with work beginning April 2, 2018 and finishing the fall of 2018.
Businesses are open! - March 13, 2018 at 9:27 a.m. - The City is launching a comprehensive effort to assist businesses during the North Monroe Corridor revitalization project this summer.
Sprague/Sherman Bridge Plaza - January 31, 2018 at 1:24 p.m. - Improve the Sprague Avenue and Sherman Street intersection providing a transit hub to facilitate the University District Bridge.
2018 Residential Grind and Overlay - January 29, 2018 at 4:56 p.m. - Grind and overlay and ADA ramp reconstruction where necessary. Project funded with local funds.
2018 Residential Chip Seal Projects - January 29, 2018 at 4:41 p.m. - Residential Chip Seal pavement preservation projects. This work will include all prep work including minor pavement repair, crack sealing, sweeping.
Spokane Street Preservation North, Phase 1 - January 29, 2018 at 4:36 p.m. - Pavement rehabilitation of six streets spread across the city. Project funded with federal funds.
Sunset Boulevard from Royal Street to Lindeke Street - January 24, 2018 at 3:53 p.m. - Update paving surface via grind and overlay. The new surface will be striped with three vehicle lanes and two bicycle lanes.
Five Mile Booster Station from Belt Street to Woodside Avenue - January 23, 2018 at 2:41 p.m. - The construction of a new booster station located east of the existing station designed with the ability to add additional capacity for future growth.
Central Avenue Well #2 Rehabilitation - January 23, 2018 at 2:39 p.m. - Station to be upgraded and modernized with a new building housing a single pump and motor. Project funded with federal funds.
Sharp Avenue Stormwater Improvements from Pearl to Hamilton - January 18, 2018 at 4:17 p.m. - Full roadway reconstruction with stormwater improvements, concrete & HMA pervious pavement sections, roadway bumpouts, & replacement of the water main
Community Development (CD) Sidewalks - September 18, 2017 at 4:48 p.m. - Combined with 2016080 and 2017103, CD Sidewalks, 9th/Altamont Realignment and Lighthouse Pedestrian Crossing
Pavement starts on Lincoln/Monroe project - September 12, 2016 at 5:03 p.m. - Crews will begin paving portions of the Lincoln/Monroe corridor this week and will work
Major Improvements for Havana Street - July 6, 2015 at 10:23 a.m. - This project includes stormwater improvements and porous asphalt bicycle lanes
Decreasing pollutants in Latah Creek - July 2, 2015 at 2:05 p.m. - A Combined Sewer Overflow (CSO) tank will reduce pollutants in Latah Creek and improve road conditions in the Latah Valley neighborhood
13th Avenue Water Main - January 1, 2015 at Midnight - This project will replace approximately 700 feet of distribution main and provide new services with meters and boxes at the property line on 13th Ave.
2013 Downtown Pedestrian Improvements - January 1, 2015 at Midnight - This project will design and construct pedestrian improvement in the Downtown Core consisting primarily of structural sidewalk repair/replacement.
2014 Neighborhood Traffic Calming, District 2 - January 1, 2015 at Midnight - This project includes the installation of sidewalk, curb ramps, street trees, traffic island, marked crosswalks, and some sign installation.
2014 Neighborhood Traffic Calming, District 3 - January 1, 2015 at Midnight - This project includes the installation of sidewalk, curb ramps, painted crosswalk, sign installation, bump outs, and sharrows.
2015 Arterial Curb Ramp Projects - January 1, 2015 at Midnight - Install ADA-compliant curb ramps at each intersection corner ahead of the City of Spokane scheduled street maintenance grind and overlay projects.
9th and Pine Reservoir Repainting - January 1, 2015 at Midnight - This project will replace the interior and exterior coating of the steel tank and remove a fountain structure from the top of the tank.
Central Avenue Wells 1 and 2 Rehabilitation - January 1, 2015 at Midnight - This project will upgrade and modernize the Wells with a new building housing a single pump and motor.
Connect to Transit, Hardscape Improvements Phase 2 - January 1, 2015 at Midnight - This FTA Section 5317-funded project includes construction of ADA accessible curb ramps, sidewalk, pavement patching, and other items.
Combined Sewer Overflow (CSO) Basin 12 Control Facility - January 1, 2015 at Midnight - This project will consist of one 690,000-gallon storage facility, conveyance improvements to outflow, new CSO regulator and outfall and more.
Combined Sewer Overflow (CSO) 20 Control Facility - January 1, 2015 at Midnight - This project will construct a storage facility for CSO Basin 20, with connecting piping, interceptor inlet vault, flush systems, and other items
Downtown Bicycle Network Completion Phase 2 - January 1, 2015 at Midnight - Restripe roadways to include bike lanes on the south side of Main Avenue and the north side of Spokane Falls Boulevard, including appropriate signage.
Garden Park Booster Station Rehabilitation - January 1, 2015 at Midnight - This project will replace the existing booster station building with a new building, pumps and motors.
Garden Springs Creek Restoration - January 1, 2015 at Midnight - This is two projects being done at the same time, LID and restoration projects.
Hartson Avenue from Altamont Street to Fiske Street - January 1, 2015 at Midnight - This reconstruction project will involve rebuilding the full depth roadway section of traveled way, fill sidewalk gaps, replace curbing, and more.
Havana Street Improvements - January 1, 2015 at Midnight - Improvements include full width pavement replacement, complete sidewalk gaps and porous asphalt bicycle lanes.
High Drive from Bernard Street to Grand Boulevard - January 1, 2015 at Midnight - This integrated project includes pavement reconstruction, CSO 24 storage facilities, storm sewer, 208 swales and water main replacement.
Lincoln Heights Reservoir Tank #1 Rehabilitation - January 1, 2015 at Midnight - This project will replace the liner and complete other repairs as needed for a 10-million gallon concrete tank.
Main Avenue Streetscape Pilot Project - January 1, 2015 at Midnight - Improvements for Main Street include streetscape, visual enhancements, east-west connectivity.
Panorama Drive Water Main Replacement - January 1, 2015 at Midnight - This project will replace cast iron distribution mains and repave the entire street.
Union Basin Stormwater Improvements - January 1, 2015 at Midnight - Construct stormwater treatment and disposal facilities (swales and similar facilities.)
Ray Street Opens Early - July 25, 2014 at 9:08 a.m. - Ray Street between 20th and 21st avenues reopened to traffic early Friday.
Construction on High Drive is set to begin - July 17, 2014 at 1:54 p.m. - The 2014 Construction Season is underway and High Drive is one of the bigger projects happening this year.
Construction season in full swing - May 27, 2014 at 5:10 p.m. - Work will begin on six major arterial street projects in the next several weeks.
Francis Avenue Construction - February 14, 2014 at 4:30 p.m. - As part of the 10-year Street Bond, the City of Spokane is planning to rehabilitate Francis Avenue from Division to Crestline streets.