2021 Residential Grind and Overlay – North - Residential street repaving. Minor storm sewer system repairs and upgrades may also be completed as part of the paving project.
Haven Grind & Overlay - Grind & overlay of Haven St. from Market (near Rockwell) to Market (near Columbia) including pavement repair and ADA ramp replacement.
Holland Avenue Sewer (Normandie to Colton) - This project will construct a gravity sewer pipe from North Pointe Lift Station (Colton and Holland) to the intersection of Holland and Normandie.
Nevada/Joseph Ped Hybrid Beacon - Installation of marked crosswalk and pedestrian crossing safety devices, including stop bars, illumination, and audible signals.
North Spokane Corridor (NSC) – WSDOT - The North Spokane Corridor (NSC) is a 10.5 mile limited access corridor, linking I-90 on the south, to existing US 2 and US 395 on the north.
Northeast Force Main - Construct an additional force main (8-inch) between the Northeast Lift Station and the existing stub at Rowan and Myrtle.
Havana Well Pump Station - Construct two building well pump station for six new wells (already drilled) including pumps, motors, controls, and yard piping.
High System Water Tank - The City is evaluating tank location alternatives for the high system pressure zone.
Spotted Road Booster Station - Construction of a new water booster station for the Plains Pressure Zone. This project is funded with local funds.
Thor-Freya 2nd/3rd Intersections - Full roadway reconstruction with concrete, curb and stormwater facilities replacement, ADA ramp upgrades, and water/sewer replacements.
2021 Residential Grind and Overlay – North - Residential street repaving. Minor storm sewer system repairs and upgrades may also be completed as part of the paving project.
Cochran Basin Treatment Facilities - Construction of treatment and infiltration ponds at the Downriver Disc Golf Course to treat stormwater generated in the Cochran Basin.
Cochran Siphon Connections - Connects the 60" siphon to be installed with TJ Meenach Street and Stormwater Improvements to the existing 60" siphon pipe.
Sundance III Force Main Replacement - This project will upgrade an existing PVC sewer force main to ductile iron pipe on Comanche Dr. from Ridge Crest Drive to Shawnee Avenue.
Washington Basin Stormwater Project - The project includes replacing the water & sewer lines and installing 3 large stormwater treatment vaults & drywells to infiltrate the treated water.
Downtown
2022 Street Maintenance Curb Ramps - Installation of ADA ramps on streets which will receive a grind and overlay by the street department.
2015 Arterial Curb Ramp Projects - Install ADA-compliant curb ramps at each intersection corner ahead of the City of Spokane scheduled street maintenance grind and overlay projects.
2018 (Cycle 8) Traffic Calming - Miscellaneous street and sidewalk improvements focused on pedestrians and traffic calming. This project is funded with local funds.
2018 Residential Chip Seal Projects - Residential Chip Seal pavement preservation projects. This work will include all prep work including minor pavement repair, crack sealing, sweeping.
Spokane Street Preservation North Phase 2 - Grind and overlay of various streets, update curb ramps for ADA compliance. This project is funded with local and federal funds.
Sprague Avenue Rebuild Phase I - Street reconstruction including partial side replacement bumpouts, landscaping, pedestrian lighting, utility replacement, etc.
13th Avenue Water Main - This project will replace approximately 700 feet of distribution main and provide new services with meters and boxes at the property line on 13th Ave.
2014 Neighborhood Traffic Calming, District 2 - This project includes the installation of sidewalk, curb ramps, street trees, traffic island, marked crosswalks, and some sign installation.
2015 Arterial Curb Ramp Projects - Install ADA-compliant curb ramps at each intersection corner ahead of the City of Spokane scheduled street maintenance grind and overlay projects.
2018 (Cycle 8) Traffic Calming - Miscellaneous street and sidewalk improvements focused on pedestrians and traffic calming. This project is funded with local funds.
2018 Residential Chip Seal Projects - Residential Chip Seal pavement preservation projects. This work will include all prep work including minor pavement repair, crack sealing, sweeping.
2021 Residential Grind & Overlay - South - Repave residential streets. Minor storm sewer system repairs and upgrades may also be completed as part of the paving project.
2021 Street Maintenance Curb Ramps - Curb ramp installation associated with grind and overlay work to be performed by the Street Department.
9th and Pine Reservoir Repainting - This project will replace the interior and exterior coating of the steel tank and remove a fountain structure from the top of the tank.
Arterial Curb Ramp Projects - South - Update curb ramps for ADA compliance on streets where the street department has done grind and overlay projects.
Combined Sewer Overflow (CSO) 20 Control Facility - This project will construct a storage facility for CSO Basin 20, with connecting piping, interceptor inlet vault, flush systems, and other items
Division Street Gateway Improvements - Construct aesthetic upgrades including tree/landscape installation, curb bumpouts and pedestrian lighting.
Downtown Bicycle Network Completion Phase 2 - Restripe roadways to include bike lanes on the south side of Main Avenue and the north side of Spokane Falls Boulevard, including appropriate signage.
Martin Luther King Jr. Way Phase I - Work has completed on the first phase of the Martin Luther King Jr. Way project, also referred to as the Riverside Extension, Phase I.
Rehabilitation of CSO Facilities - This project includes the rehabilitation in various forms of the three CSO tanks: CSO 34-2, CSO 34-3 and CSO 10.
Riverside Drive Phase 2A - The Riverside Extension Phase 2A project, from Sherman Street to Erie Street is a continuation of the Riverside Extension Phase 1 project.
2015 Arterial Curb Ramp Projects - Install ADA-compliant curb ramps at each intersection corner ahead of the City of Spokane scheduled street maintenance grind and overlay projects.
2016 Residential Chip Seal Projects - Residential Chip Seal pavement preservation projects. This work will include all prep work including minor pavement repair, crack sealing, sweeping
2016 Residential Grind & Overlay Projects - Residential grind and overlay pavement preservation project. Work will include minor subgrade repair, crack sealing, modifying ADA ramps
2018 (Cycle 8) Traffic Calming - Miscellaneous street and sidewalk improvements focused on pedestrians and traffic calming. This project is funded with local funds.
2018 Residential Chip Seal Projects - Residential Chip Seal pavement preservation projects. This work will include all prep work including minor pavement repair, crack sealing, sweeping.
Arterial Curb Ramp Projects - North - Update curb ramps for ADA compliance on streets where the street department has done grind and overlay projects.
Barnes Road from Strong Road to Phoebe Street - Pave the existing Barnes Road grade. This includes pavement, curb, sidewalk, drainage facilities, bike lanes and a 12 inch water line.
Central Avenue Well #2 Rehabilitation - Station to be upgraded and modernized with a new building housing a single pump and motor. Project funded with federal funds.
North Monroe Corridor - The City will rebuild North Monroe Street from Indiana Avenue to Kiernan Avenue, with work beginning April 2, 2018 and finishing the fall of 2018.
North River Drive Sidewalk - Grind and overlay, sidewalk installation (on the south side), and stormwater improvements.
Wellesley/Maple Intersection - To improve traffic flow, the westbound left turn lane will be lengthened by approximately one block via island modifications.
2013 Downtown Pedestrian Improvements - This project will design and construct pedestrian improvement in the Downtown Core consisting primarily of structural sidewalk repair/replacement.
2018 (Cycle 8) Traffic Calming - Miscellaneous street and sidewalk improvements focused on pedestrians and traffic calming. This project is funded with local funds.
CSO Basin 23 Control Facility - Construction of 38,000 gallon storage tank in Ash Street and 13,000 gallon storage tank in Cedar Street near the intersection with Summit Parkway
CSO Basin 25 Improvements, Phase 1 and 2 - Water, sanitary and storm sewer installation/replacement and creation of stormwater swales on Main Ave, Water Ave, and Cedar St.
MLK Jr. Way/Riverside Drive Phase 2B - New street and associated utilities, swales, sidewalk and including a roundabout at Perry Street and Trent Avenue
Red Bank Park River Access - Install boat ramp to Spokane River and parking lot improvements. This project is funded with local and state funds.
South Gorge Trail Phase 2 - Construct a 10-foot wide pedestrian & bike trail, water main & pavement reconstruction of Clarke Ave, and stormwater mitigation at various locations.
Sprague Avenue Rebuild Phase 2B - Sprague Ave from Division to Grant. Reconstruct the roadway while enhancing pedestrian and cyclist safety and provide utility replacements/upgrades.
Sprague/Sherman Bridge Plaza - Improve the Sprague Avenue and Sherman Street intersection providing a transit hub to facilitate the University District Bridge.